Community Investment

Once operational, Macon Solar will generate over $19.4 million in property taxes in total for all taxing districts over the life of the project.

Jobs

Committed to expanding opportunities in Macon County, this multi-year project will generate about 370 peak construction jobs and 10 permanent positions, stimulating economic growth that benefits the entire community

Energy Generated

The project will generate 208MW (megawatts) of solar, enough to power over 40,000 homes.

About Us

Doral is developing the Macon County Solar Project in Macon County, Missouri. The Macon County Solar Project is a 208-megawatt alternating current (MWac) utility-scale solar powered-electric generation facility that will utilize photovoltaic (PV) panels installed on a single-axis tracking system. The Project represents an investment of over $345 million in Macon County —creating jobs, increasing tax revenues, and delivering lasting environmental benefits.

We’re committed to protecting non-participating landowners, listening to feedback, and being transparent, responsible stewards of the land.

Together with Macon County’s support, we’re building more than a project — we’re nurturing a  partnership with residents and officials to ensure the community flourishes for generations to come.

Jobs

Over $19.4 million in total property taxes for all taxing districts over the life of the Project

Jobs

54 new local jobs during construction for Macon County

369 new local jobs during construction for the State of Missouri

9.6 new local long-term jobs for Macon County

18.7 new local long-term jobs for the State of Missouri

Earnings

Over $5.0 million in new local earnings during construction for Macon County

Over $38.9 million in new local earnings during construction for the State of Missouri

Over $712 thousand in new local long-term earnings for Macon County annually

Over $1.5 million in new local long-term earnings for the State of Missouri annually

Output

Over $7.4 million in new local output during construction for Macon County

Over $67.6 million in new local output during construction for the State of Missouri

Over $1.2 million in new local long-term output for Macon County annually

Over $3.1 million in new local long-term output for the State of Missouri annually